During construction phase works, EGA provided the client with a methodology to adequately address the lead dust identified within the subfloor and ceiling spaces within the site. The scope of works was made further sensitive by the presence of a childcare centre in an adjacent portion of the building, requiring careful consideration of controls, work timing and results / clearance activities.
Works were carried out over sequential weekends to reduce the risk of accidental lead dust exposure by day care children and staff members, with airborne lead and clearance samples analysed by the laboratory over the weekend. Results of the sample analysis and associated reporting were issued Sunday mornings to ensure the childcare centre could open safely on the Monday.
